Service · HDB BTO and resale
HDB renovation, BTO and resale.
One team for the whole flat: drawings first, the HDB permit handled, nine trades sequenced in-house, and a line-by-line quote you can edit before you commit.
Send us your floor plan · WhatsApp
- Cost: most full 4-room HDB renovations we take on land between S$40,000 and S$70,000, driven by hacking, carpentry and wet works.
- Time: typically 8–12 weeks from permit approval to handover.
- Permit: we prepare and submit the HDB renovation permit and follow the approved hacking scope.
- Quote: line by line. Add or remove scope before you commit.
- Smart-ready: neutral wires at every switch, conduits and a hub point at the DB box, run while the walls are open.
BTO or resale
New BTO
Before the false ceiling and carpentry go in, every wiring decision is cheap: neutrals, conduits, pelmet power points and the hub point. Read the wiring checklist before your first site meeting.
Resale flat
If the flat is being rewired, that is the moment to make it smart-ready: neutrals and conduits go in during rewiring. The same drawings-first process applies, and partial scopes (kitchen, bathrooms, one room) are quoted the same way.
Nine trades, one team
Space planning, materials and lighting resolved before any work begins. You approve drawings, not surprises.
Approved hacking, protected corridors, debris carted out clean.
Rewiring plus smart-ready wiring on the open Matter standard, with Home Assistant, Aqara or both.
False ceilings, L-box cove lighting, and glass or drywall partitions that reshape a plan without moving structure.
Factory-built cabinets installed in days, plus main door, bedroom doors, bifolds and frames, ready for digital locks.
Concealed runs routed above the false ceiling, relocated points, heaters and fittings, pressure-tested before boxing up.
Floors, walls and wet areas laid level, waterproofed and ponding-tested before anything is sealed.
Low-VOC paints, clean cut-in lines, colours checked against your materials in daylight.
Furniture bought direct on Taobao and Pinduoduo, consolidated into one shipment, assembled by our own installers.
How it runs
- Consult
WhatsApp us your floor plan. We reply with questions, not a sales pitch.
- Design
Drawings, material boards and a line-by-line quote you can edit.
- Build
Permits, nine trades sequenced, photo updates every week.
- Handover
Defects walk, smart-home setup on your phone, warranty in writing.
HDB homes we have handed over
Before you renovate
Questions people ask
How much does a renovation cost in Singapore?
Most full 4-room HDB renovations we take on land between S$40,000 and S$70,000, driven by hacking, carpentry and wet works. Condos and landed homes vary more. Every quote is line by line, so you can add or remove scope before committing.
How long does a full renovation take?
Typically 8–12 weeks from permit approval to handover. Modular carpentry keeps fit-out 2–3 weeks shorter than site-built work, since cabinets arrive factory-finished and install in days.
Do you handle HDB permits?
Yes. We prepare and submit the HDB renovation permit, follow the approved hacking scope, and keep noise and disposal within HDB rules.
Can a resale flat become a smart home?
Yes — renovation is the best time. We run neutral wires and conduits during rewiring, then set up Matter devices with Home Assistant, Aqara or both. No subscriptions, no vendor lock-in.
Do you take partial renovations?
Yes — kitchens, bathrooms, single rooms and office fit-outs. Smaller scopes get the same drawings-first process and line-by-line quote.
Tell us about your space.
Send your floor plan on WhatsApp. We reply with questions first, then drawings and a line-by-line quote.
WhatsApp us · +65 8897 9983


