Service · Carpentry and doors
Modular carpentry, the factory way.
We don’t quote site-built carpentry. Every cabinet we fit is cut, edged and finished on a factory line, then assembled in your home, which is where the consistency, the price and the short install come from.
Send us your floor plan · WhatsApp
- Install: 2–5 days with little dust, against 2–3 weeks for site-built work.
- Shorter renovation: fit-out finishes 2–3 weeks sooner, since cabinets arrive factory-finished.
- Edges: machine-applied PUR edging, sealed against Singapore’s humidity.
- Boards: low-emission, with test reports on file.
- Approval: a 3D visual of layout and finishes, agreed before anything is cut.
Modular vs site-built
| Modular · what we fit | Site-built · what we don’t | |
|---|---|---|
| Where it's made | A controlled factory line — the same process, every cabinet | On site, by hand — quality moves with the crew of the day |
| Edges | Machine-applied PUR edging, sealed against humidity | Hand-glued edging that can lift and darken in Singapore's damp |
| Boards | Low-emission boards, with test reports on file | Whatever was sourced that week — reports are rare |
| Fit & finish | Panels cut to the millimetre, colour matched across every door | Gaps and shade differences show up once it's on the wall |
| Hardware | Branded soft-close hinges and runners, under warranty | Mixed sources, mixed lifespans |
| What you approve | A 3D visual of the layout and finishes, agreed before anything is cut | A 2D sketch, and the rest on trust |
| Install time | 2–5 days, little dust | 2–3 weeks, dust on site |
Feature walls and doors
Feature walls, fluted panels and awkward nooks are still ours to design. They are built as modules and made-to-measure fillers taken off your plan, not improvised against the wall.
We also supply and hang every door in the flat: main door, bedroom doors, bifolds and frames, hung square and ready for digital locks. See choosing a gate and door lock.
Carpentry in our projects
Questions people ask
How long does modular carpentry take to install?
2–5 days with little dust. Site-built carpentry typically takes 2–3 weeks on site.
How long does a full renovation take?
Typically 8–12 weeks from permit approval to handover. Modular carpentry keeps fit-out 2–3 weeks shorter than site-built work, since cabinets arrive factory-finished and install in days.
Do you take partial renovations?
Yes — kitchens, bathrooms, single rooms and office fit-outs. Smaller scopes get the same drawings-first process and line-by-line quote.
Tell us about your space.
Send your floor plan on WhatsApp. We reply with questions first, then drawings and a line-by-line quote.
WhatsApp us · +65 8897 9983



