Service · Condominium and EC
Condo renovation, drawings first.
Condominium and executive condominium renovations across Singapore, planned on your floor plan and quoted line by line, so nothing is a lump sum.
Send us your floor plan · WhatsApp
- Cost: condos vary more than HDB flats, so we quote line by line from your floor plan rather than from a package.
- Time: typically 8–12 weeks from approval to handover for a full renovation.
- Carpentry: factory-built modules installed in 2–5 days with little dust, instead of 2–3 weeks of site work.
- Smart home: a 3-bedroom condo with track lighting and every window motorised typically runs S$15,000 to S$35,000 on top of the renovation.
- Partial scopes: kitchens, bathrooms and single rooms get the same drawings-first process.
Nine trades, one team
Space planning, materials and lighting resolved before any work begins. You approve drawings, not surprises.
Approved hacking, protected corridors, debris carted out clean.
Rewiring plus smart-ready wiring on the open Matter standard, with Home Assistant, Aqara or both.
False ceilings, L-box cove lighting, and glass or drywall partitions that reshape a plan without moving structure.
Factory-built cabinets installed in days, plus main door, bedroom doors, bifolds and frames, ready for digital locks.
Concealed runs routed above the false ceiling, relocated points, heaters and fittings, pressure-tested before boxing up.
Floors, walls and wet areas laid level, waterproofed and ponding-tested before anything is sealed.
Low-VOC paints, clean cut-in lines, colours checked against your materials in daylight.
Furniture bought direct on Taobao and Pinduoduo, consolidated into one shipment, assembled by our own installers.
How it runs
- Consult
WhatsApp us your floor plan. We reply with questions, not a sales pitch.
- Design
Drawings, material boards and a line-by-line quote you can edit.
- Build
Permits, nine trades sequenced, photo updates every week.
- Handover
Defects walk, smart-home setup on your phone, warranty in writing.
Condominiums we have handed over
Worth reading first
Questions people ask
How long does a full renovation take?
Typically 8–12 weeks from permit approval to handover. Modular carpentry keeps fit-out 2–3 weeks shorter than site-built work, since cabinets arrive factory-finished and install in days.
Do you take partial renovations?
Yes — kitchens, bathrooms, single rooms and office fit-outs. Smaller scopes get the same drawings-first process and line-by-line quote.
Can one motor handle a full-height condo curtain?
Up to about 4 m of track, yes. Beyond that we split the run into two tracks with a motor each, because a single motor pulling heavy blackout fabric across a long run is slow and audible.
Do smart homes have monthly fees?
They should not. Matter, Apple Home, Google Home and Home Assistant have no subscription. Only cloud camera history (Nest Aware, some brands) charges monthly, which we avoid with local-storage cameras.
Tell us about your space.
Send your floor plan on WhatsApp. We reply with questions first, then drawings and a line-by-line quote.
WhatsApp us · +65 8897 9983






